Site navigation (main menu).

x709kW Multi-site project (Site 3 – 211kW)

 

 

  • Combined output of 181MWh per annum
  • Climate-controlled refrigeration on site, making very good use of the electricity generated by both arrays
  • High demand means the maximum value is realised for the generated electricity

 

 

 

SHED 1

 

 

 

The second largest of all the arrays in the project, at 133kW, is located on Shed 1 on Site 3. 

 

 

 

 

 

 

SHED 3

 

 

 

A further 78 kW system was connected to Shed 3 at the same site, just across the yard.

 

 

 

Published on: 16 Jun 2014